Hall was open all day, but is now being locked up. During the day the
following was done:

- ABS Turbo controller replaced
- Target warm up completed. Vacuum became very poor and it took longer
than expected to get to the point that cool down of cell could begin.
- BLAST trim coil problem traced to corruption of EPICS database. Problem
addressed.

Plan for tonight:

1. Clear South Hall and ramp up BLAST supply and holding fields.

2. Genya will tune up target. Will set up polarized deuterium, 50 sccm.

3. Run once target is ready. Keep current to 100 mA for tonight for
comparison with previous data.

All shifts are on.

-- 
**********************************************************************