[BLAST_SHIFTS] daily BLAST meeting 5/13

From: Tancredi Botto (tancredi@lns.mit.edu)
Date: Thu May 13 2004 - 18:03:07 EDT


_ Work on SFT continued, will be tested today in the hall.
  Meanwhile Tx work will continue until 8 pm
_ ABS vacuum will be reconnected starting tomorrow. Expect target
  install/tuning to continue up to saturday afternoon

_ In the meantime we should run unpol H2, for calibrations, spin flipping
  (d2) states for false asymmetries. Both nik and aki on shift tonight.
  Ligit should be 1/sqrt(2) ABS flow (6.6E-8 ?) for ~ equal target
  thickness. If chambers allow higher target thickness

- BillF shows snake/spin tune study results obtained with flipper
  overnight. Spin tune where we want (close 1/2). Also, a feedback
  of the compton rate been made available to CCR. This resulted in
  a speedier tune for compon pol. Calorimeter rate back to ~ 1 KHz/mA
  This gives us a chance to arrive at a tune for both compton and
  experiment.

_ Note: a problem with unpol buffer system was solved (roughing pump not
  pumping ...). Buffer system should operate well tonight

-- 
________________________________________________________________________________
Tancredi Botto,  		phone: +1-617-253-9204  mobile: +1-978-490-4124
research scientist		MIT/Bates, 21 Manning Av    Middleton MA, 01949
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:31 EST