[BLAST_SHIFTS] Shift summary 05/26/2004 A (1-9)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Wed May 26 2004 - 08:55:58 EDT


Operator: nikolas

Polarized data taking continued afetr 1am. No significant problems except a 30min problem with the beam the CCR had to look into. Spin at 32 degrees.
Runs 7805-7816 taken. Crunching.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:31 EST