[BLAST_SHIFTS] Shift summary 05/27/2004 B (9-17)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Thu May 27 2004 - 17:05:01 EDT


Operator: karpiusp

Many problems today with CCR investigating problems of beam current dropping. After tweaking the sextupoles and the slits, we decided to give CCR the beam. Then transmitter, IOC, and ABS problems prevented data taking unil approx 1600. At that point D2 ABS resumed.