[BLAST_SHIFTS] Shift summary 06/04/2004 B (9-17)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Fri Jun 04 2004 - 17:13:38 EDT


Operator: kohlm

Power supply problem with polarized source in the morning fixed.
Beam was used for finding a tune acceptable for both Compton and BLAST.
No production data taken during this shift.
Hall access in the afternoon for alumi tour.
Wire chamber gas changed. Blast power supply tripping during ramping investigated.

MK