Operator: akdogan
This was a pretty smooth shift of data taking with ABS-D2 target.
Runs taken: 8575-8582. Being crunched (lrn crashed for run 8571 and 8576)
Beam was acceptable. The injection current got worse; dropped from 130mA
to 118mA at the second quarter of the shift, with a life time of 23-24min. The
beam polarization (63-64%) seems to be unaffected by the solenoid problem
mentioned in the previous shift summary. Had to hard-reset the coda/fastbus
once. Noticed that D-tunnel is *hot* (90-95F). The HV-system was mostly quite.
Tripped only a couple of times due to the beam conditions.
Overall, we collected a decent amount of data with negligible interruptions.
Taylan