[BLAST_SHIFTS] Shift summary 07/10/2004 A (1-9)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Sat Jul 10 2004 - 09:11:45 EDT


Operator: yxiao

Still no beam during the shift. Took one cosmic run with l2trig -- 8730. From 5:40am CCR began the attempts to put the beam in the ring. Still waiting for their good news.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:31 EST