[BLAST_SHIFTS] Shift summary 07/18/2004 C (17-1)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Mon Jul 19 2004 - 01:21:39 EDT


Operator: shariton

Had problems with the HV at the start of the shift. However at ~20:30 the Chief Operator realized that the injection and DAQ overrides were on. Once we turned them off everything ran very smoothly.

The IntRFrefAlarm went off a few times. Called Genya at 22:10 and the RF was retuned to fix the problem.

Runs 9078, 9081,9083-9086,9088-9089 are being crunched through my prototype auto-cruncher. This should not have any affect on the results though.

9087 and 9090 are being crunched normally



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:31 EST