[BLAST_SHIFTS] Shift summary 07/20/2004 A (1-9)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Tue Jul 20 2004 - 10:02:08 EDT


Operator: yxiao

Smooth data taking. Lost beam once due to a power failure of the transver
holding field. Got it back after 30 min.

Good runs: 9140-9144, 9146-9153, 9153-9156; crunching was caught up.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:31 EST