[BLAST_SHIFTS] Shift summary 07/21/2004 C (17-1)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Thu Jul 22 2004 - 01:17:46 EDT


Operator: manouch

Smooth shift after beam became available for data taking (@ 9:00 pm)
today the ABS dissociator was regenerated and the glass tube was replace (installed a quartz tube instaed of pyrex).
Genya made the ABS avialble around 7:30
Imax=135 mA, expect to get higher after a bit running
good runs 9202-9210 w/ 9204=junk (9th run).
only one WC trip.
all new runs submitted for crunching
Manouchehr



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:31 EST