The problem with box L32 became solved when Aaron investigated it during
access to SH.
A 60 kV power supply of the polarized source failed in the late morning.
The crystal delivers only reduced intensity at present, needs to be
heated.
Ring can still be filled to 150mA but filling takes longer. We will try to
run overnight with what we can get.
It was decided to do the crystal baking and snakes filling tomorrow, and
to open SH only shortly on Wednesday morning (7 am) for the DOE tour (at
8am).
Regards,
Michael
--+-------------------------------------+--------------------------+ | Office: | Home: | |-------------------------------------|--------------------------| | Dr. Michael Kohl | Michael Kohl | | Laboratory for Nuclear Science | 5 Ibbetson Street | | MIT-Bates Linear Accelerator Center | Somerville, MA 02143 | | Middleton, MA 01949 | U.S.A. | | U.S.A. | | | - - - - - - - - - - - - | - - - - - - - - -| | Email: kohlm@mit.edu | K.Michael.Kohl@gmx.de | | Work: +1-617-253-9207 | Home: +1-617-629-3147 | | Fax: +1-617-253-9599 | Mobile: +1-978-580-4190 | | http://blast.lns.mit.edu | | +-------------------------------------+--------------------------+
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:31 EST