[BLAST_SHIFTS] Shift summary 11/04/2004 A (1-9)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Thu Nov 04 2004 - 09:15:48 EST


Operator: zwart

No beam.

BLAST PS tripped. The middle fuse failed in the main 480 disconnect on the
wall of the South Hall. The electricians were called in to replace the fuse. Subsequently the 480 breaker on the roof failed to reset. The electricians are addressing the issue.

TZ

                                            TZ