[BLAST_SHIFTS] Shift summary 11/21/2004 A (1-9)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Sun Nov 21 2004 - 09:04:01 EST


Operator: hasell

Generally smooth running.

HV GUI had to be rebooted 3 or 4 times. This corresponded to trips in the HV and trips in the machine which delayed injection so lower than optimal total charge.

Still collected charge around 380 C/hr for most of shift.

Runs 12788 12790-12795



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:32 EST