[BLAST_SHIFTS] Shift summary 11/21/2004 B (9-17)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Sun Nov 21 2004 - 16:59:17 EST


Operator: akdogan

Mostly smooth shift.

Other than a coda-roc problem that costed about 25mins, we
kept taking good ABS-H2 data, with a steady pace of 380-390 C/h.
The beam parameters stayed roughly the same as yesterday:
165mA/35min with 67+-1% polarization.

Taylan



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:32 EST