[BLAST_SHIFTS] Shift summary 12/02/2004 B (9-17)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Thu Dec 02 2004 - 17:01:13 EST


Operator: wangxu

Power failing is around 10:00am. All the detectors and ABS finished rebooting around 13:08. we take 1 cosmic run 13028 for bats and the other regular cosmic runs because CCR was not ready to deliver beam.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:32 EST