[BLAST_SHIFTS] Shift summary 12/02/2004 C (17-1)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Fri Dec 03 2004 - 00:52:54 EST


Operator: zhangchi

Bill setup Compton, Genya set up ABS before they left. Genya and Taylan both called later.

CCR ramped up Blast PS ot arround 8:30. delivered beam at about 11pm. taking ABS H2 data ever since.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:32 EST