Operator: zhangchi
Bill setup Compton, Genya set up ABS before they left. Genya and Taylan both called later.
CCR ramped up Blast PS ot arround 8:30. delivered beam at about 11pm. taking ABS H2 data ever since.
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:32 EST