Operator: yxiao
No data taking at all. CCR took all night to tune the beam with zero Blast field and WC on, but still no hope till now: WC scalers (L/R) are around 3200/2600.
At the beginning of the shift, an ABS turbo pump failure was detected. The problem was fixed around 20:40pm, and now ABS is working well.
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:32 EST