[BLAST_SHIFTS] Shift summary 02/27/2005 C (17-1)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Mon Feb 28 2005 - 01:50:51 EST


Operator: yxiao

No data taking at all. CCR took all night to tune the beam with zero Blast field and WC on, but still no hope till now: WC scalers (L/R) are around 3200/2600.

At the beginning of the shift, an ABS turbo pump failure was detected. The problem was fixed around 20:40pm, and now ABS is working well.