[BLAST_SHIFTS] Shift summary 03/28/2005 B (9-17)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Mon Mar 28 2005 - 16:45:52 EST


Operator: clasie

Deuterium running all shift with 210mA injection current.

The HV GUI needed rebooting at 10:20am, and after the recovering from this, CCR called to say they needed to add cesium to the source. An access was made by the vacuum group soon after this call, and at the same time Chris Vidal swapped the WC gas bottles.

Data taking resumed at 11:30am, and was stopped at at 12:10pm for an access to the hall by the mechanical group. This was finished by 12.30pm and data taking resumed. The rest of the shift was smooth.