[BLAST_SHIFTS] Shift summary 04/04/2005 B (9-17)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Mon Apr 04 2005 - 18:05:42 EDT


Operator: clasie

The hall was open and cosmic data was taken all day. There was no beam by the end of the shift.

Run 14912 has not finished crunching, so there are no new polarization results.

The WC gas and water was replaced.

Karen investigated the flasher noise in the LG. The details are in the elog. Karen changed the HV set points and the ADC ribbon cable.