Running on polarised D

No problems, R24 which was tripping occasionally during the high
intensity unpolarised runs in the previous shift is back to its
nominal voltage and holding fine.

Short access to open back door to let out the synchrotron light :-)

Runs 16322-16327 taken and being crunched.

                                                                         
                       Cheers,
                                                                         
                                       Douglas