[BLAST_SHIFTS] 06/10/03 C-shift summary

From: Baris Tonguc (baris@spinspin.lns.mit.edu)
Date: Wed Jun 11 2003 - 00:07:04 EDT


It took some time to get back CCR w/ beam after a power surge. We set
unpolarized Hydrogen to 0.1 sccm and started to take data. S/N ratio
is 1:3-4 on the wire chambers. Below is the runs taken during the shift.
813 lamda/2 in
814 lamda/2 out
815 lamda/2 in

Baris, Wang



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:29 EST