Operators: tsentalovich seely yxiao
after hall was closed ET worked on ion polarimeter study.
beam was available after 9pm. HK did some ABS scans.
ready to run aroudn 10pm - but BQMs were not reading out. after soem calls to DH and TZ, and some trips to the Dtunnel we got them working again. they had been mis-cabled at the patch panel.
after BQMs came back on, CCR worked on the slits. started taking polarized Hydrogen runs at 11pm.
JS
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:29 EST