Operators: zhangchi yxiao clasie
no beam for the entire shift after SF6 arching at the very beginning.
during the few minutes when we did have beam, WC L6 tripped a few times.
WC HV crates are turned OFF from HVGUI during the shift
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:29 EST