Re: [BLAST_SHIFTS] Shift summary 02/25/2004 A (0-4)

From: Bill Franklin (wafrankl@mit.edu)
Date: Thu Feb 26 2004 - 06:20:53 EST


To be more specific, the problem in the linac is with the Budzar Cooler
(the device which regulates the oil temperature) for Transmitter 6. Rich
Campbell and Rich Capidolupo have been here all night working to get it
back up. Initially, they were going to replace an internal pump, but
apparently a spare device had to be swapped in. They are still
working and need at least a few more hours, as there is some processing
time once the new Budzar is wired in.

On Wed, 25 Feb 2004, Electronic Log Book wrote:

> Operators: ajmasch vziskin vziskin
>
> Some shit broke again. Called in the experts. Will take all night to
> fix. Typical. Can't remember last time we ran for 24 hours straight.
> The guys in the CCR tell me they used to run for days on end before
> BLAST. Somehow, it seems to make all the sense in the world. They will
> fix this problem just in time to open up the hall for more work. And
> them something else will trip, rip, crap out or burn. One more
> question, how come we shield a left cerenkov wall and the right cerenkov
> wall becomes more efficient. Or is this one of those BLAST misteries.
> I think that's it. F**k it , I'm going home.
>
>
>

-- 
**********************************************************************
Wilbur A. Franklin			*  Phone: 617-253-9518
Bates Linear Accelerator Center		*  FAX:	  617-253-9599
P.O. Box 846				*  Email: wafrankl@mit.edu
Middleton, MA 01949			*
**********************************************************************



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST