[BLAST_SHIFTS] Shift summary 07/03/2004 C (17-1)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Sun Jul 04 2004 - 00:47:31 EDT


Operator: nikolas

At the beginning of the shift, CCR had transmitter problems and data taking was interrupted until 6:45. Past that beam and other problems were less dramatic. Data taken on polarized D2 and crunching.

As compared to 24h ago, Ligit has dropped by more than 10%. Even though the convectron gauge on the polarized feed system does not indicate a significant increase (which would imply nozzle freezeout), the regeneration process may be necessary soon. Ernie indicated it may be too early.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:31 EST