Operator: nikolas
At the beginning of the shift, CCR had transmitter problems and data taking was interrupted until 6:45. Past that beam and other problems were less dramatic. Data taken on polarized D2 and crunching.
As compared to 24h ago, Ligit has dropped by more than 10%. Even though the convectron gauge on the polarized feed system does not indicate a significant increase (which would imply nozzle freezeout), the regeneration process may be necessary soon. Ernie indicated it may be too early.
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:31 EST