[BLAST_SHIFTS] Shift summary 03/06/2005 A (1-9)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Sun Mar 06 2005 - 09:06:45 EST


Operator: ajmasch

the beam problems at the end of the previous shift turned out to be due to the quitting of some fans in the evaporative cooling system in the south hall ring. once fixed, the water inside was too cool and needed to be warmed up a bit. got beam back at 03:20.

every ten minutes or so, ligit kept spiking up from 1.0e-7 to 1.3e-7. it's not the abs spin flip; it's something else.

beam started becoming bad enough to close v14 and v15 around 08:00.

good data:
14097-14102