Re: [BLAST_SHIFTS] one bad day

From: Peter Karpius (karpiusp@einstein.unh.edu)
Date: Wed Oct 09 2002 - 23:15:15 EDT


Also last night on shift we were, at one point, missing RTOF1 bot. I went
to the D-tunnel, checked it on the scope and it was fine. Upon
reconnection the signal had returned to the scalers. So certainly we have
some flaky connectors for out raw analog signals.

                                        Pete

 
-------------------------------
Pete Karpius
Graduate Research Assistant
Nuclear Physics Group
University of New Hampshire
phone: (603)862-1220
FAX: (603)862-2998
email: karpiusp@einstein.unh.edu
http://pubpages.unh.edu/~pkarpius/homepage.htm



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:28 EST